Go2 Interim Report April 3–7, 2026 — Five days, no EOD reports filed

Go2 Interim Report
Apr 3–7, 2026

Five days. 66.6 hours. A sales pipeline built and activated, a governance overhaul that consumed four of those days, and the system that runs the show reshaped from the ground up.
Total Hours
66.6
5 days tracked
Words Dictated
155K
1,775 recordings
Git Commits
94+
2 repos
Claude Sessions
58
567KB transcripts
Pipeline Deals
70
11 stages in HubSpot
Warm Emails Sent
18
Sent Tuesday as scheduled
Open Loops
29
3 DO TODAY
Worst Readiness
29
Sun Apr 6 — 20h day
Daily Breakdown
Day Hours Voice Commits Sleep Ready Headline
Thu Apr 3 15.9h 32,920 23 68 55 Sales pipeline rebuilt, discovery factory codified
Fri Apr 4 9.9h 20,997 8 68 Access open-sourced, machine recovery, report QA
Sat Apr 5 7.2h 5,620 ~20 59 50 4 new skills deployed, security scan
Sun Apr 6 20.0h 72,300 13 45 29 AGENTS.md governance overhaul, Memory Engine triage
Mon Apr 7 13.6h 23,437 30+ 78 58 Video EP1, scheduled tasks, Cal.com fix, conductor arch
Total 66.6h 155,274 94+

Top work apps by time: Codex (1,561min), Chrome (1,184min), Claude (695min), ChatGPT (160min), Code (117min), OpenWork (61min).

Week Arc

The Shape of Five Days

Thursday loaded the sales gun: 70 deals wired in HubSpot, 11 pipeline stages, 18 warm email drafts created with PDF attached, 10 VIPs identified, discovery factory proven on real ██████ data. The strongest revenue-generating day of the period.

Friday pivoted to infrastructure: Access open-sourced, 190 zombie processes killed, machine recovered, report QA framework established. The self-audit landed: 179 hours of dense work over the preceding two weeks, the most productive stretch since late November.

Saturday was lighter — skills tooling (4 new slash commands deployed to all platforms), security scanning, and content production. The governance cleanup started showing up in voice transcripts.

Sunday was the marathon: 20 hours, 72,300 words dictated, Readiness 29. The entire day was spent reshaping AGENTS.md from a drift-prone collection of per-agent files into a real operating contract. Memory Engine got triaged — 4,076 entries audited, 2 credential leaks found and cleaned. ██████’s operating contract for April was written. Cash flow pressure surfaced (██████ short, Brex card routing decisions with ██████).

Monday channeled the governance work into concrete artifacts: conductor architecture defined, scheduled monitoring tasks went live, AI training video EP1 content recorded, Cal.com integration fixed, Gmail OAuth re-authorized after agents had been falsely reporting it broken for days.

Sales Motion Status

The 18 warm email drafts created Thursday were scheduled and sent on Tuesday as planned. The pipeline was built Thursday and activated on schedule. What remains open: the 5 VIP personalized emails (need individual treatment), the Email 2 follow-up bump template (discussed, not finalized), and the 11 HOLD deals pending ██████ confirmation. The cowork-sales/ACTIVE.md hasn’t been updated since April 3.

Day 1

Thursday, April 3 — Sales Pipeline + Discovery Factory

15.9h tracked. 32,920 words dictated. Top apps: Codex 421min, Chrome 233min, Claude 164min.

Sales Pipeline Overhaul (Larry)

Discovery Factory Doctrine (Larry + Moe)

Voice: What Scott Was Thinking

Revenue spike analysis — data shows direct sales involvement creates revenue spikes every time. Tension with ██████ around the subscription staffing lane. Email sequence refinement debated. Operational fire: ██████ never rotated a Google API key, ██████ unauthorized charge. UI architecture directive: apps must open in new shelves with meta descriptions for internal tracking. QA system design: operator mentality, not engineer deliverable — auditor-planner-engineer model.

Infrastructure (Shemp)

Unified skills migration (Issue #46) — deploy_skills.sh upgraded, lifecycle skills created. Transcript sync repair. Pulse log active.

Day 2

Friday, April 4 — Access Open-Source + System Design

9.9h tracked. 20,997 words. Top apps: Chrome 180min, Claude 178min, ChatGPT 101min, Codex 83min.

Access Open-Source Release (Larry)

Report QA Framework (Larry + Scott)

Machine Recovery

~190 zombie MCP server processes (~800MB RAM) killed. Cloudflare tunnel config fixed. Full restart.

Voice: What Scott Was Thinking

Skills vs MCPs: skills are the encompassing wrapper (“Dutch dolls stacking together”). Two-week self-audit: 179 hours of dense work, most productive period since late November. Corrected agent memory on “sales and operations” — bad term, agents can’t be scoped by business function because of context thresholds.

Day 3

Saturday, April 5 — Skills + Security + Content

7.2h tracked. 5,620 words. Top apps: Chrome 174min, Claude 120min, Codex 117min. Lightest day of the period.

Skills Installation (Larry)

Anthropic Harness Design Research

Analyzed Anthropic engineering blog: structure by stage (Planner → Generator → Evaluator), not by task. Implications: MD files should define success criteria, not implementation steps.

Voice: What Scott Was Thinking

Content production dominated — slide-by-slide iteration on automations-for-non-coders. Caught an agent unauthorized change (replaced “harness” with “Input layer” — corrected immediately). Security posture: automated scanning, evaluating Access architecture for hardening before public release. Confirmed product name: “Access” not “Access Vault.”

Day 4

Sunday, April 6 — The Governance Marathon

20.0h tracked. 72,300 words dictated. Top apps: Codex 635min, Chrome 232min, Claude 175min, Code 92min.
Sleep 45, Readiness 29 — worst of the week. Heaviest work on the most depleted day.

AGENTS.md Restructure (Larry + Moe + Scott)

Memory Engine Triage (Larry)

██████ / April Agent Setup

Operating contract written and sent via DM. Governance/audit rules defined. #ai-comms: ██████ requested Google OAuth for Access; Scott directed self-provisioning path.

Financial Context

Cash flow discussion with ██████ and ██████: ██████ short, Brex card active until May 5, deferred payments to Apr 15, decided not to move Stripe to TD Bank.

Voice: What Scott Was Thinking (72K words)

228 recordings mention agents/governance/cleanup. Fundamental taxonomy debate: “AGENTS.md is not the system itself — you are the model, the session, and the instructions.” Nested agent MD containment at scale. Profile vs brain repo boundaries. Frontier QA mandate: /verify before every code commit. Decision framework: “haircut vs tattoo” — reversible vs irreversible. Confidence scores on agent suggestions. Brand decision: potentially consolidating cowork.ai back under Go2. Memory write rule: “before saving new memories, clarify with Scott — interrupt a session, it doesn’t matter.”

Day 5

Monday, April 7 — Conductor Architecture + Video + Scheduled Ops

13.6h tracked. 23,437 words. Top apps: Chrome 365min, Codex 305min, Claude 58min, Notes 31min.

AI Training Video EP1 (Larry + Scott)

Scheduled Tasks Go Live

Cal.com Fix

Google Meet integration was broken: static URL instead of per-booking links. ██████’s booking had no working link — apology sent, config fixed. ██████’s Apr 16 booking flagged as also needing manual fix.

Gmail OAuth Recovery

go2 and personal accounts had expired tokens. Re-authorized. Incorrect API paths had caused agents to falsely report “API is broken” for days.

Voice: What Scott Was Thinking

Three-tier routing architecture articulated: local conductor → cloud conductor → cloud router. “If you have a name, you’re a conductor.” App UI iteration: hourly cost warning thresholds, confetti on mode transitions, notification sounds, OpenRouter CTA. Data security posture: OpenRouter as default because limited credits = low-consequence exposure. “Do not delete to replace” rule for all agents.

Open Loops

Prioritized Action Items

Do Today — April 8

1. Finalize Email 2 template and send follow-up bumps. 22 deals in Waiting for Reply had next_step dates set to Apr 8. Email 2 was discussed but never finalized. Scott’s direction: “went through ██████’s notes, don’t see how this wouldn’t create value, still filling pilot spots.”

2. Write and send 5 VIP personalized emails. ██████, ██████, ██████, ██████, ██████. Scott said these can’t get the template — need individual treatment. Deferred “until fresh” on Apr 4.

3. Commit and push this session’s fixes. telemetry-digest.py fix, OBSERVATIONS.md entries, Shemp launchd fix, this report — all uncommitted.

Do This Week

5. Ask ██████ about 11 HOLD deals. ██████, ██████, ██████, ██████, ██████, ██████, ██████, ██████, ██████, ██████, ██████. Can’t proceed without knowing if ██████ sent intros.

6. Check ██████ booking. He said “I’m interested” and got the calendar link. No acceptance came through. Also: his Apr 16 booking has a broken Meet link (pre-fix).

7. Apply security fixes to production access.moran.bot. Issue #71 (P0): 2 CRITICAL (live creds in .env.local, owner password as base64), 6 HIGH (unauthenticated endpoints, no rate limiting, error leaks). Open-source repo got partial fixes; production did not.

8. Memory system restructuring — at minimum design approach. Issue #70 (P0): flat index, no routing by context, no metadata. Root cause of agent drift and token waste.

9. Triage 5 stale P1 issues. #64 (dispatch-relay rename), #63 (voice name resolution), #61 (Access contract rollout), #58 (transcript mining), #57 (unified transcript pipeline).

10. Verify Shemp launchd fires correctly. Fixed paths and reloaded, but next scheduled fire (9am/12pm/3pm/6pm) hasn’t been tested yet.

11. ██████ follow-up. Engage audit report sent Apr 1. No reply. 7 days — past nudge threshold.

Do When Bandwidth Allows

12. Access open-source repo cleanup. package.json still says "private": true, .env.example still says “Access Vault”, Zod/rate-limit subagent work unconfirmed.

13. Go2 Crew audit canonicalization. Moe’s Apr 3 handoff explicitly says this needs a pass to separate canonical output from scratch.

14. Discovery product prompt iteration. Third run collapsed into “fake completion mode.” Prompt stack needs data-framing rule and completion bias fix.

15. SubSummit 2023 reactivation pack. 9 companies, paste-ready. Untouched since creation.

16. ██████ draft recreation at ██████. Bounced from ██████, needs re-intro.

17. Mega Scrape completion. 36/44 done. Remaining 8 groups untouched since Thursday.

18. List cowork.ai on Afternic at $200K. Discussed, not executed.

19. Complete dispatch-relay rename (Issue #64). Symlink in place, proper rename not done.

20. ██████ onboarding decision (Issue #39). 20 days stale. ██████ showed signs of life Apr 5 in #ai-comms. Scott decides: re-engage or park?

Governance Debt

Uncodified Decisions — Made Verbally, Never Written Down

These decisions were articulated clearly in Superwhisper transcripts but do not appear in decisions.md, AGENTS.md, or any governed doc:

# Decision Date Destination
1 Three-tier routing: local conductor → cloud conductor → cloud router Apr 7 decisions.md — new “Agent Architecture” section
2 Named agent = conductor by default. Only unnamed subagents are generalists/workers. Apr 6–7 decisions.md
3 AgentMD = one-to-one with project scope (in OpenWork, Claude, Codex) Apr 6 decisions.md
4 Agents cannot be scoped by business function (sales, operations) — context thresholds make it impossible Apr 5 AGENTS.md Section 2 or decisions.md
5 Run /verify before every code commit Apr 6 decisions.md — QA section
6 Before saving memories, clarify with Scott — interrupt the session Apr 6 AGENTS.md Section 3 (Memory Engine)
7 “Harness” is approved terminology — still shows “Pending Approval” in glossary.md since March 18 Apr 4–5 glossary.md — move to Approved
8 Do not delete to replace (data management rule for all agents) Apr 7 decisions.md
9 Confidence scores on next-action suggestions — agents should end replies with scored options Apr 6 AGENTS.md Section 4
10 Sweep “Access Vault” → “Access” in all governed docs Apr 6 decisions.md line 60 still says “Access vault”
11 Time-bound OKRs in AGENTS.md — 1-week, 1-month, 3-month goals Apr 6 AGENTS.md Section 6 (Goals)
Infrastructure Health

Fixed and Still Broken

Fixed This Session (Apr 8)

telemetry-digest.py: Was querying empty browser_sessions table. Every report since March 19 was missing browser workflow data. Now extracts 133 sites/services from Chrome window titles. Posted to OBSERVATIONS.md.

Shemp launchd plist: Was pointing to deleted agents/shemp/ paths. Automated sentry patrol was broken since the governance cleanup. Paths updated, gh added to PATH, job reloaded.

Still Broken

Shemp Slack bot token (MEDIUM) — #74 — can’t post to #ai-comms

Shemp profile path (LOW) — #75 — still at pending-placement

Curly (MEDIUM) — Stale since Mar 27. Gmail MCP wrong inbox. Parked.

Production access.moran.bot security (HIGH) — #71 — unauthenticated endpoints, no rate limiting, creds exposed

Memory system architecture (HIGH) — #70 — flat index, no routing, no metadata

browser_sessions table (INFO) — Empty in Cowork.ai product. Workaround in place.

Strategic Assessment

What This Week Actually Meant

Work vs Overhead

Of 45 brain repo commits, 13 were real deliverables. 32 were Shemp SOD/sentry sweeps, pulse logs, handoff refreshes, and status updates. 29/71 split. The discovery factory commits (28 in a separate repo) and app builds aren’t counted in this ratio, so brain repo disproportionately reflects coordination overhead. But the overhead is real — Shemp is committing 4–5 times daily for updates that often say “nothing changed.”

Sales Momentum

Thursday built the machine. The 18 warm emails were scheduled and sent on Tuesday as planned — the core outreach motion executed on schedule. What’s still open: the 5 VIP personalized emails (need individual treatment), the Email 2 follow-up bump template (discussed, not finalized), the SubSummit 9-company reactivation pack (untouched), and the 11 HOLD deals pending ██████ confirmation.

Governance ROI

The security work was non-optional: 2 credential leaks, 190 zombie processes, compromised API key. The AGENTS.md overhaul is foundational but its value is entirely deferred — it pays off only if agents execute measurably better because of it. The governance work consumed most of Friday through Monday and crowded out the sales momentum Thursday built.

Three Biggest Leverage Opportunities

1. Close the remaining outbound gaps. The 18 warm emails went out Tuesday as scheduled. What’s still open: 5 VIP personalized emails, the Email 2 follow-up bump template for the 22 Waiting-for-Reply deals, the SubSummit 9-company reactivation pack, the ██████ draft at ██████, and the 11 HOLD deals pending ██████ confirmation.

2. Throttle Shemp’s commit frequency. 32 of 45 brain commits were overhead. Collapse to 1–2 commits/day max with a higher bar for what justifies a commit. Redirect freed capacity toward transcript processing or mega-scrape completion.

3. Protect sales from displacement. Governance consumed 4 of 5 days. Going forward, cap governance/infrastructure at a fixed daily block and make sales execution non-displaceable. The pipeline is well-architected. It needs activation, not more architecture.

What’s Still Open